Tank ribs and skin

Tue, Aug 5th 2008


I got started today by clecoing all of the T-703 and T-704 tank ribs in place. In order to do this, I had to remove the outboard leading edge assemblies. Then I drilled the ribs to the T0702 tank baffles and T-712 attach brackets. Then the leading edge assemblies were reinstalled, and the T-701-L was clecoed to the ribs and spar. I ran out of clecos about 10 shy of getting it 100% clecoed and called it a night.

Drawing: 10A, 16A
Hours: 2.73

Entry Image: 1218075387

Entry Image: 1218075371
Entry Image: 1218075387
Entry Image: 1218075401