Drilling top wing skins

Sun, May 25th 2008


Today I started by match drilling the wing walk doublers to the W-702 inboard top wing skins, then I clecoed the doublers, W-702's and W-703's in place on the left and right wing skeletons. I put a cleco in every other hole, then match drilled the skins to the skeleton with a #40 drill. When I was done with all of the explosed holes, I moved all the clecoes over one hole and repeated the process.

Drawing: 12
Hours: 6.7

Entry Image: 1215749311

Entry Image: 1215749272
Entry Image: 1215749290
Entry Image: 1215749311