Starting left elevator
Wed, Dec 26th 2007
I started the left elevator by clecoing all of the stiffeners (Gen and I fabbed all of them at once for the left and right elevators) in place and drilled all of the holes to #40. I then disassembled the parts to remove all of the protective plastic from areas I didn't want it (rivet lines and inside of the E-701-L skin). Then I debured and dimpled them. I finished the day with hanging the parts and spraying them with primer.
Drawing: 4
Hours: 3.51