Match drilling skin and skeleton

Wed, Dec 5th 2007


Today was a quick day. We started by match drilling the E-709 root rib to the E-702 spar. In order to do the next step, we had to fold the trailing edge of E-701-R with our 2x6 "sheet metal brake". Then we clecoed the skelton to the E-701-R and removed the clecos holding E-709 to E-702 and clecoed the WD-605-1-R elevator horn to E-702 and E-702. The last step of the day was to match drill E-701-R to the skeleton. The work went so fast that I pretty much forgot to take any pictures.

Drawing: 5
Hours: 0.97

Entry Image: 1198433406

Entry Image: 1198433406