Aft fuselage top skins
Sat, Oct 29th 2011
Today I started with drilling the longerons for the shoulder harness anchors, then for the F-695 gussets. After drilling those pieces, I assembled the F-635 elevator belcrank and drilled everything to size. I saved the final assembly for after I have a chance to shoot a batch of primer. Next up, I clecoed the F-775 aft top skin in place with the J stringers, and final drilled all of the holes. Lastly, I added the F-787 forward top skin and final drilled all of those holes.
Drawing: 26
Hours: 7.5