Starting baggage area walls

Sun, Jan 23rd 2011


Today I started with drilling the forward bottom skin to the F-717 lower longerons, then the F-796A tank attach brackets to the fuselage. Then I pulled the F-724 and F-722 vertical and horizontal baggage area ribs out of the crate and clecoed them to the back end of the F-770 side skins to stiffen the baggage area walls. Then I clecoed the F-750 side covers in place and called it a day.

Drawing: 25, 29
Hours: 2

Entry Image: 1295821344

Entry Image: 1295821344