Finishing the center section

Mon, Nov 15th 2010


Another bulk entry for the month of November. I riveted the F-776 center bottom skin to the center section structure, then clecoed and drilled the forward and aft seat floor skins and the the baggage floor skins.

Drawing: 22, 25
Hours: 10.5

Entry Image: 1292703820

Entry Image: 1292703807
Entry Image: 1292703820
Entry Image: 1292703840
Entry Image: 1292703854
Entry Image: 1292703878