Center section disassembly
Thu, Sep 23rd 2010
Today I final drilled the center section ribs to the bulkheads and disassembled the everything for deburring.
Drawing: 22
Hours: 1.25
Thu, Sep 23rd 2010
Today I final drilled the center section ribs to the bulkheads and disassembled the everything for deburring.