Finishing vertical stab.
Sun, Nov 4th 2007
I started the day with spraying all the primered parts with clear coat to seal them, then after they were dry, I started with assembling the rear spar. I clecoed, then riveted the VS-808PP, 410, 411 and 412 to the VS-803PP. The lower rivets were flush rivets, with the heads facing the front of the vertical stab. Then the VS-704, 705, 706, and 707 were riveted to the VS-702 front spar. I then clecoed and riveted the VS-801PP skin to the front spar assembly and finished the day with riveting the rear spar in place.
Drawing: 6
Hours: 4.17