Cover support ribs
Sat, Apr 24th 2010
Today I prepped the F-782B L&R and F-783 L&R cover support ribs and then the F-704M web stiffeners. After priming them, I riveted the nutplates on, then riveted the support ribs and stiffeners to the F-704A. I finished the day by fabricating the F-704J spacers out of aluminum tubing.
Drawing: 11
Hours: 3.5